facilities

CPCG Industrial Estate realizes that reliable utilities are the important factor of production in every hi-technology industry. Hence, CPGC definitely provides utility services with reliability and efficiency.

Utility Management System in each project can be classified to 10 sections as followings

  • Electricity System

    Electricity System

    115/22 KV. SUBSTATION WITH LOOP DESIGN

    115 KV. TRANMISSION LINE ELECTRICITY FROM PEA

    Co-Gen Power Plant


  • Steam Supply

    Steam Supply

    Steam supply for industry nearby the Co-Gen Power Plant


  • Water Supply & Reservoir

    Water Supply & Reservoir

    FRESH WATER CAPACITY AROUND 14,400 CU.M. / DAY RAW WATER COMES FROM EAST WATER AND RESERVOIRS WITHIN PROJECT (CAPACITY 429,622 CU.M.)


  • Waste water Treatment System

    Waste water Treatment System

    WITH SEQUENCING BATCH REACTOR (SBR) SYSTEM CAPACITY AROUND 12,000 CU.M. / DAY


  • Road System and Parking Area

    Road System and Parking Area

    MAIN ROAD: 50 METERS WIDTH, 6 LANES INCLUDING TRAFFIC ISLAND. PRIMARY ROAD: 30 METERS WIDTH, 4 LANES AND CENTRAL PARKING AREA AROUND: 10 RAI.


  • Natural Gas System

    Natural Gas System

    3 PTT gas pipelines within project boundary


  • Telecommunication System

    Telecommunication System

    Fiber optic backbone and support hi-speed Internet


  • Green Area

    Green Area

    More than 300 Rai green area with 10 m. greenbelt boundary for natural relaxing zones


  • Fire Hydrant System

    Fire Hydrant System

    Max Distance 150 m.each Fire Hydrant covered all area


  • Commercial Area

    Commercial Area

    In addition to industrial space. CPGC also provided areas for shops, residences and recreational facilities. For the well-being of people in this community


Back to Top